How CoreBIM works
The path of information, from sketch to building maintenance
CoreBIM organises the information of a construction project according to ISO 19650. This page explains who does what, which states each file goes through and how the work moves from the first idea to the finished building and its maintenance. CoreBIM does not draw models. Designers model in their own tools and CoreBIM stores, organises and controls the information that comes out.
Who is who
Everyone has a clear role in the process.
| Party | Who they are | What they do |
|---|---|---|
| Client / owner | Whoever commissions and pays for the work (the client). | Sets the goals and what they need to receive at the end. |
| Project coordinator | The person responsible for all project information, often the information manager or the architect who coordinates. | Sets up the project in CoreBIM, defines the teams and rules, reviews the work and authorises what is published. |
| Designer | The specialist technician: architect, structural, water or electrical engineer, and so on. | Produces the information for their discipline and uploads it to CoreBIM. |
| Contractor | The company that builds the work. | Uses the published information to build and returns the information on how it was built. |
| Asset manager | Whoever operates and maintains the building once it is finished. | Uses the final information for maintenance over the years. |
The four states of a file
Each file (what we call an information container) goes through four states. The state tells everyone where the information stands and who can see it.
The journey step by step
Take the example of an architect. The same journey applies to any discipline.
Project phases
The journey above repeats in every phase. With each phase the information gets more detailed and closer to the real building. Phases differ from country to country. In Portuguese public works they follow Portaria no. 255/2023 (which replaced the old 701-H/2008).
1. Brief (Programa Base)
Checks that the work is viable and studies alternative solutions. The information is still general.
2. Concept design (Estudo Prévio)
The solution that best meets what the client wants is chosen. The overall concept is defined.
3. Preliminary design (Anteprojeto)
The chosen solution is developed and the final basis is fixed. Detail increases.
4. Detailed design (Projeto de Execução)
Everything needed to build with precision is produced: written documents, drawings and bill of quantities.
When the project needs a permit from the local authority, the request is filed with the information of the matching phase. Permitting is a separate legal process, not a design phase.
From construction to maintenance
CoreBIM follows the information beyond the design of the project.
Glossary
The terms used on this page, in plain language.
- CDE (Common Data Environment)
- The single place where all project information is stored and shared. That is what CoreBIM is.
- Information container
- Each deliverable managed in CoreBIM (a model, a drawing, a document), with its own identity, status and history.
- Revision
- Each version of a container. Codes P01, P02 are preliminary versions; C01, C02 are contractual versions.
- Task team
- The group for one discipline. Each team has its own Work in progress area, which the others cannot see.
- Naming convention
- The rule that names every container consistently, so everyone understands what each file is.
- Discipline
- The designer's technical area: architecture, structures, water, electrical, and so on.
- Federated model
- The models of all disciplines put together, to see the whole building and coordinate.
- PIM and AIM
- The project information model (during construction) and the asset information model (during building operation).